How Long to Remodel a House: What Contractors Won’t Tell You
Remodelling your home can be an exciting adventure, but it’s important to know what to expect in terms of time.
Whether it's a simple update or a full renovation, understanding the timeline is key.
In this guide, we’ll break down the factors that affect how long a home remodeling project takes and provide tips to help you plan, manage expectations, and keep everything on track.
How long to remodel a house?
A full home remodel take typically 3-6 months, depending on the size and complexity. Plan for delays and always communicate with your contractor to keep things on schedule.
Key Takeaways
The time it takes to remodel a house depends on the scope of the project, the work required, and the availability of materials and contractors.
Small-scale remodels can take a few weeks, while larger projects may take several months or more.
Good planning, clear communication with contractors, and realistic expectations are key to a successful remodel.
What Affects the Duration of a House Remodel?
The timeline for remodelling a house is influenced by various factors. Some of the primary aspects that determine how long the project will take include:
Project Scope
The size of the remodel is one of the most significant factors in determining how long it will take.
A small remodel, such as updating the kitchen or bathroom, may take just a few weeks, while more extensive projects, such as gutting and rebuilding entire rooms or adding extensions, can take several months or even longer.
Minor Remodels: Small projects like updating paint, replacing fixtures, or installing new flooring can often be completed within a few weeks to a month.
Major Remodels: Larger projects such as adding new rooms, changing the layout, or gutting the interior can take several months, depending on the complexity of the work.
Permits and Approvals
For more extensive renovations, you may need to apply for permits from local authorities.
The permitting process can sometimes cause delays, especially if approvals are required for structural changes, electrical or plumbing work, or new additions.
Permits typically take anywhere from a few days to several weeks to obtain, depending on the nature of the remodel and local regulations.
Tip: Be sure to factor in permit timelines when planning your remodel. Waiting for approval can cause project delays, so it’s best to start the application process as early as possible.
Contractor Availability and Scheduling
The availability of contractors can also play a significant role in how long your remodel will take.
Highly sought-after contractors may have a busy schedule, leading to longer waiting times for project initiation.
Additionally, the availability of subcontractors, such as electricians, plumbers, and carpenters, can further affect the overall timeline.
Tip: Start planning your remodel well in advance and book your contractors early to avoid unnecessary delays.
It’s important to allow some flexibility in your timeline to account for any scheduling issues.
Material Selection and Sourcing
The materials you choose for your remodel will also impact the timeline.
Standard materials, such as basic flooring or common countertop materials, are usually readily available and can be sourced quickly.
However, if you opt for custom materials or high-end finishes, there may be a longer lead time.
Tip: Research material availability before starting the remodeling process. If you're planning to use custom or specialty materials, order them in advance to avoid delays.
Unforeseen Issues
Sometimes, hidden issues can arise once work begins, such as water damage, structural problems, or outdated wiring.
These unforeseen complications can delay the project, as they may require additional work or permits to address. It’s important to set aside time and budget for these types of surprises.
Tip: Expect the unexpected, especially in older homes. Be prepared for potential delays and additional costs if any unforeseen issues arise during the remodel.
Typical Remodeling Project Timeframes
Below are approximate timelines for different types of remodels. These estimates can vary based on the scope of the project, but they provide a general idea of what to expect.
Minor Remodels (2 to 4 weeks)
Smaller projects that don’t require significant changes to the structure of the home can usually be completed relatively quickly. Examples of minor remodels include:
Painting rooms or the entire house
Replacing kitchen or bathroom fixtures
Installing new flooring
Upgrading lighting or plumbing
These types of remodels generally take 2 to 4 weeks, depending on the complexity and size of the space being updated.
Moderate Remodels (1 to 3 months)
Moderate remodels typically involve more substantial changes but don’t require major structural work. These projects can include:
Kitchen or bathroom renovations
Replacing or adding cabinetry
Installing new countertops or backsplashes
Changing the layout of rooms (without moving walls)
These remodels generally take 1 to 3 months, depending on the size of the space and the materials used.
Major Remodels (3 to 6 months or longer)
Major remodels involve extensive changes, such as structural alterations, room additions, or complete overhauls of multiple spaces. Examples of major remodels include:
Adding new rooms or extensions
Gutting and rebuilding entire floors or spaces
Moving or adding walls
Reworking plumbing, electrical systems, or HVAC
These types of remodels can take anywhere from 3 to 6 months or longer, depending on the scale and complexity of the work.
How to Plan Your Remodel Timeline
While some aspects of your remodel are beyond your control, such as the availability of contractors or the permitting process, there are steps you can take to stay on track and ensure the project is completed as efficiently as possible.
Set Realistic Expectations
It's important to understand that remodelling is often a lengthy process. While you may be eager to complete the project, keep in mind that quality work takes time.
Setting realistic expectations from the outset can help you stay patient during delays and setbacks.
Create a Detailed Schedule
A detailed timeline will help keep your remodel on track. Work with your contractor to establish a clear schedule with milestones and deadlines.
This will help everyone involved stay focused and ensure that the project progresses smoothly.
Allow Buffer Time
Even the best-planned remodels can face unexpected challenges.
Allow for extra time in your schedule to accommodate potential delays, such as back-ordered materials or unanticipated structural issues.
Prioritize Key Areas
If time is a concern, prioritise the areas that need the most work.
For example, if you’re remodelling a kitchen, focus on critical elements like plumbing and electrical work before worrying about cosmetic updates like backsplash tiles or paint.
This ensures that the core structure is completed first, allowing you to live in the space while finishing touches are added later.
When to Call in a Professional
If you’re attempting a DIY remodel, it’s essential to know when to call in a professional.
Some tasks require specialised skills or tools, and hiring a contractor can ensure that the job is done safely and efficiently. Examples of tasks that should be left to professionals include:
Electrical work, including rewiring or new installations
Plumbing work, such as installing new pipes or fixtures
Structural work, like removing walls or adding new load-bearing structures
HVAC installations or changes to the ventilation system
Hiring the right professionals can help prevent delays and ensure that your remodel is completed on time and to a high standard.
Frequently Asked Questions
1. How long does it take to remodel a kitchen?
A kitchen remodel typically takes 1 to 3 months, depending on the complexity of the work and the materials used. This includes design, demolition, and installation.
2. Can I live in my house during a remodel?
In most cases, you can live in your house during a remodel, especially for smaller projects. However, for major remodels, it may be more convenient to temporarily relocate if the work is disruptive.
3. How much does a full home remodel cost?
The cost of a full home remodel can vary significantly based on size, location, and the scope of the work. On average, a full home remodel can cost anywhere from $50,000 to $200,000 or more.
Conclusion
The timeline for remodelling a house depends on the size and complexity of the project. While small renovations can take a few weeks, major remodels can extend over several months.
Understanding the factors that affect the duration of a remodel and planning accordingly can help you manage your expectations and ensure the project progresses smoothly.
Whether you choose to handle the remodel yourself or hire professionals, being prepared and realistic about the time it will take will make the experience much more manageable.